Commentaires : Year of construction 1992 - has works until 05.12.2008 Decembers 2008
Plant consists of the following components - Work 240t/h - Mixing tower Ammann - Double drum double barrel of DDC 723 - Emission control/dust extracting installation SBH 70 - Filler silo 1 x 100t doubles one above the other standing, 1x50t -4 x bitumen tank a.50 000l - Thermalölheizgerät - Elevators, augers - Electrical installation with complete control in a cab in option -1 high bay warehouse silo for bitumen heatable with chain conveyor as Beschicker
The plant was waited regularly, annually and is in a very good condition